We’re sharing exclusive footage from the construction of Odom , a premium complex in the center of Phnom Penh, Cambodia’s capital. This is one of the rare projects on the market that offers two powerful tools for investors:
- GRR — guaranteed rent
- GBB — guaranteed buyback
The videos show the construction site from the inside and compare how Odom stands out from other projects.
Watch videos
ODOM – video from the mega-project construction site (YouTube):
“How the Elite is Born in Cambodia: An Exclusive from the ODOM Construction Site” (YouTube):
Developers provide monthly construction reports , and our clients are always kept informed.
More about the project:
We invite you to check out the progress of the ODOM Construction Update project – November .
A recent report from the construction site. Work is progressing well: concrete is being poured for the columns, the building core, ramps, and stairwells. The core wall and floor slabs from Level -5 to Level 3 are already fully completed.
And as a reminder, ODOM remains the only project in Phnom Penh with a five-level underground parking garage . This is a rarity for Cambodia and a huge plus for future owners: convenience, security, and high liquidity.





Update: ODOM Construction Progress | January 2026
All structural work on the project has been completed. The building’s reinforced concrete frame has been completed—from Basement Level 5 to the upper floors, including columns, floors, walls, stairways, ramps, and slabs.
The building’s underground section is fully completed. The structural phase of construction has been fully completed, confirming the project’s actual implementation and the transition to the next stages.









ODOM — construction report 27.05.2026
- The readiness of the podium part of the project has reached 15%
- The filling of the columns and the core wall at the Ground Floor level has been completed
- Work is underway on reinforcement and preparation of the Level 1 plate Concrete and monolithic works are actively continuing at the site
- Tower cranes and several construction zones are operating simultaneously
- The project is gradually moving into the active phase of vertical construction in the Phnom Penh center